Dimly lit industrial room with large metal electrical or server racks lined up in a row.
careers

Energise on the date. Start with us.

Ten roles in engineering, delivery, field and safety, based at our Wacol depot in Brisbane. Kestrel Power starts trading on 4 January 2027. Apply with our careers portal.

pages
01

Dates that hold.

Every project has a named commissioning lead from award and a weekly float report. You are judged on the energisation date.

02

Own the test.

We plan to own $1.39m of test equipment. The engineer who writes the test sheet watches it run on our own plant.

03

Built from day one.

14 people by the end of Q1 2027, 90 by Q4. Early hires set how Kestrel works, from the first site safety rule to the first readiness review.

life at Kestrel Power

Workshop, test lab, and the site at 6am.

Workers inspecting and repairing large industrial electrical panels in a dimly lit factory.
workshop
Two people working at a curving desk with multiple computer screens in a dark office.
test lab
Rows of industrial shipping containers under streetlights at dusk with a dark cloudy sky.
site - 6am
Three workers in helmets standing and talking inside an industrial facility with control panels.
the team
Silhouette of person in dark room with multiple computer monitors lit on a desk.
readiness review

benefits

12% superannuation on top of base
All roles
Overtime and allowances paid on top
Field roles
Tickets and ESI authorisation pathway supported
Field roles
Apprenticeship sponsorship after 12 months
Trade Assistant
RPEQ registration pathway supported
Engineers
Field safety training, funded
Field roles
Travel allowance beyond 50 km of Wacol
Field roles
One work-from-home day after probation
HV Engineer