Accreditation and licences

Status as at 21 November 2026. Kestrel Power is a new company and starts trading on 4 January 2027. We hold no licences, accreditations or certifications yet. Everything below is a target with a date, and we will mark each one as held only when we have the certificate.

Licences and accreditation targets

Queensland electrical contractor licence: to be held before trading starts on 4 January 2027. We will not quote or start electrical work without it.

Powerlink pre-qualification: application in Month 1 (January 2027), approval targeted for Month 6 (June 2027).

Energy Queensland accredited service provider (Energex and Ergon Energy): application in Month 2 (February 2027), approval targeted for Month 6 (June 2027).

Essential Energy and Transgrid accreditation: application in Month 6 (June 2027), approval targeted for Month 12 (December 2027).

ISO 45001 and ISO 9001: stage 1 audit in Month 5 (May 2027), certification targeted for Month 9 (September 2027).

ISO 14001: targeted in Year 2 (2028).

Essential Eight, Maturity Level 2: targeted by Month 9 (September 2027).

Standards we build and test to

AS/NZS 3000:2018, AS 2067:2016, ENA EG-1, ENA Doc 001-2008, ENA NENS 04, the AS 62271 series (switchgear), the AS 60076 series (transformers), AS/NZS 3008.1.1 (cable current ratings), AS/NZS 3017 (testing), AS/NZS 4836:2023 (safe working on or near low-voltage and extra-low-voltage electrical installations) and IEC 61850 (substation communications). Network service provider requirements apply on top of these.

Legislation

Electrical Safety Act 2002 (Qld), Electrical Safety Regulation 2013, Work Health and Safety Act 2011 (Qld), National Electricity Rules Chapter 5 where a connection is involved, and the Security of Critical Infrastructure Act (SOCI) where a client is a regulated asset owner. The network service provider owns the energisation approval on every project.

Insurances

Planned cover, bound before trading: $20 million public and products liability, $10 million professional indemnity (rising to $20 million before Kestrel takes any design and construct contract above $40 million), $10 million environmental impairment and $5 million cyber. Certificates of currency will be issued on request to [email protected] once the policies are bound.

Photography

Photographs on this site are illustrative. They are sourced from Magnific under the Magnific licence and do not show Kestrel Power projects, crews or plant.

Two people working at a curving desk with multiple computer screens in a dark office.
Three workers in helmets standing and talking inside an industrial facility with control panels.
Dimly lit industrial room with large metal electrical or server racks lined up in a row.

Fonts and icons

Archivo and IBM Plex Mono are licensed under the SIL Open Font License and served from Google Fonts (licence information). Icons are drawn on a 24 px grid at 2 px stroke; some come from Feather and Icons8 under their licences.

Ask for evidence

Clients and network service providers can request status updates and supporting documents at [email protected].